The 2-Mile Report · Third quarter 2026

What changed within two miles of Belle Aire

Every figure below comes from a public record — the city's permit file, its planning and zoning boards, the county assessor's parcel roll and the state's road programme. Each one is checkable, and the sources are listed at the bottom.

Figures as of 2 September 2026, and fixed there. A later week is published as a new edition rather than by rewriting this one.

New homes going up

2026 so far
17
Peak, 2021
107
Since 2021
305
YearNew homes permitted
2021107
202245
202351
202454
202531
202617

These are permits for newly built homes only — not remodels, additions or commercial work — and the city's file runs about two months behind, so the current year is always incomplete.

Builders opening phases. Several lots permitted on one street on one day is a builder starting a section rather than neighbours coincidentally building. The most recent nearby: 5 lots on Hancock St (2026-03-26); 4 lots on Maney Ave (2025-12-05); 3 lots on Spring St (2025-05-01).

What homes changed hands for

These are recorded transfer prices from the Rutherford County assessor's parcel roll — the amount written on the deed when a house changed owners. They are not MLS sold prices, and this is not a comparative market analysis. Nothing here is adjusted for condition, upgrades, seller concessions or how long anything sat.

Year Recorded sales countedMedian recorded price Median, resales only
2025263$355,000$352,410
2026 part year, 8 of 12 months139$360,000$357,500

Median price recorded on the Rutherford County assessor's parcel roll for parcels classed 'Single Family' within 2 miles of the centre, whose most recent recorded transfer fell in that year and was for $50,000 or more. Recorded transfer prices are not MLS sold prices, and this is not a comparative market analysis.

One of these years is still filling. A part year's count keeps climbing until December and cannot be set beside a finished year as though the two measured the same span, and even its median covers a different slice of the selling season. Read the medians beside one another rather than as a change: the year-on-year percentage this page could print would be smaller than its own margin of error, so it is not printed.

The most recent qualifying transfer on the roll inside two miles is dated 7 August 2026, about 26 days before this report was compiled. Deeds appear only once the assessor has processed them, so none of this is this week's market.

Why there is no five-year price line on this page

The county roll keeps one sale per parcel: the latest one, which overwrites the one before it. So a year older than the two above is not a record of what sold that year — it is only the homes that sold that year and have not sold since. The further back it goes, the more of the year has been overwritten, and the more the houses left in it are the ones that stayed put.

They are shown because leaving them out would look like a gap where there is an explanation. They are not a trend, they are not comparable with the figures above, and the two must never be drawn as one line.

Year Homes sold that year and still un-resold Median of those, and only those
2021300$295,750
2022254$325,000
2023186$355,450
2024237$355,000
  • 2021. Survivorship: 5 years of later resales have overwritten this year's parcels, so its count is a floor and its median describes the houses that stayed put.
  • 2022. Survivorship: 4 years of later resales have overwritten this year's parcels, so its count is a floor and its median describes the houses that stayed put.
  • 2023. Survivorship: 3 years of later resales have overwritten this year's parcels, so its count is a floor and its median describes the houses that stayed put.
  • 2024. Survivorship: 2 years of later resales have overwritten this year's parcels, so its count is a floor and its median describes the houses that stayed put.

The small print, in full

Every qualification the assessor's figures arrive with, unedited and in the words they were written in, including the ones that name the fields they came out of. Choosing which of these a reader sees is not this page's job.

In front of the boards

What has been asked for near you, and what the Planning Commission and Board of Zoning Appeals did about it. 23 items within two miles; 20 already decided.

Mandatory referral on West College Street

Mandatory referral — West College Street, 1.5 miles away

Public hearing scheduled Planning Commission, 19 August 2026

Setback variance on Maitland Drive

Setback variance — Maitland Drive, 1.3 miles away

Awaiting minutes Board of Zoning Appeals · LLC (Original

Special use permit on Old Salem Road

Special use permit — Old Salem Road, 1.8 miles away

Awaiting minutes Board of Zoning Appeals

Mac 3 Properties, Lots 1 & 2

Final plat · 2 lots or units · 1.25 acres — East Main Street, 1.0 miles away

Approved Planning Commission, 19 August 2026 · Mac 3 Properties, LLC

Sanders Corner, Lots 1-3

Final plat · 3 lots or units · 4.61 acres — Sulphur Springs Road, 1.2 miles away

Approved Planning Commission, 19 August 2026 · P&H Joint Venture

Legacy Pointe, Section 1, Phase 4

Final plat · 13 lots or units · 2.6 acres — Humanity Trail, 1.8 miles away

Approved Planning Commission, 19 August 2026 · Rutherford County Area Habitat for Humanity, Inc.

Bellwood Annex, Resubdivision of Lot 63 & Brown Brothers, Resubdivision of Lot 3

Final plat · 2 lots or units — Houston Drive, 1.9 miles away

Approved Planning Commission, 19 August 2026 · Chris Highers

Annexation on Cherry Lane

Annexation — Cherry Lane, 1.0 miles away

Approved Planning Commission, 5 August 2026 · LLC and the City of Murfreesboro

Mandatory referral on Cherry Lane

Mandatory referral — Cherry Lane, 1.0 miles away

Approved Planning Commission, 5 August 2026 · Middle Tennessee Electric

Mandatory referral on Bradyville Pike

Mandatory referral — Bradyville Pike, 1.7 miles away

Approved Planning Commission, 5 August 2026 · SEC, Inc.

Special use permit on Halls Hill Pike

Special use permit — Halls Hill Pike, 1.1 miles away

Awaiting minutes Board of Zoning Appeals

Northfield-Smith LLC, Resubdivision of Lots 3 & 4

Final plat · 2 lots or units · 6.96 acres — North Tennessee Boulevard, under a quarter mile away

Approved Planning Commission, 15 July 2026 · Glen Hill Investments, LLC

An item on an agenda has been applied for, not approved. Where a decision is shown it comes from the minutes of that meeting. Some of these matters the boards settle themselves and some they only recommend, with City Council deciding afterwards, and the minutes word both as a motion to approve — so an approval above may still have a Council stage to come, and this page does not tell you which.

Commercial and multi-family

Commercial and multi-family development, which the residential permit layer cannot see. Neither source classifies land use; project names are quoted as filed. The two stages below are kept apart on purpose: an application is not a building, and grading is not an opening.

Asked for — site plan applications

47 current within two miles: recently filed, and not cancelled — the eight most recently submitted are below. The layer holds 96 in this radius altogether, counting older applications and cancelled ones.

  • Dollar General
    submitted 11 June 2026 · no status recorded yet · 0.9 miles away
  • Storplace Halls Hill Tenant Space
    submitted 11 June 2026 · no status recorded yet · 1.5 miles away
  • Beautiful Giggles Academy
    submitted 11 June 2026 · no status recorded yet · 1.7 miles away
  • Center for the Arts
    submitted 14 May 2026 · no status recorded yet · 1.5 miles away
  • 406 W Burton St Parking
    submitted 12 March 2026 · no status recorded yet · 1.5 miles away
  • Grace Lutheran Church Pergola
    submitted 12 February 2026 · no status recorded yet · 0.4 miles away
  • Northfield Lascassas
    submitted 12 February 2026 · no status recorded yet · 0.5 miles away
  • Haynes Brothers Lumber
    submitted 15 January 2026 · no status recorded yet · 1.8 miles away

An application, not an approval and not a building permit. Status is the city's own workflow wording, reproduced unchanged.

Started — land disturbance permits

4 open within two miles. Grading is the earliest physical signal the city publishes, months before anything is visible above ground — and it says only that earth may be moved. It is not a building, a tenant, or a date.

  • Maney Estates
    Active · 1.3 acres · 1.0 miles away
  • MTCS Football Field
    Active · 1.93 acres · 1.0 miles away
  • MTSU Garage Demo
    Active · 14.21 acres · 1.2 miles away
  • Mercury Park Redevelopment Ph II
    Active · 3.71 acres · 1.6 miles away

Grading is the earliest physical signal, and it is not an opening. The layer carries no issue date; the year shown is read from the permit number. Most rows have no address either, and are located by the mapped point alone. Counted as open on: status Active, In Process, Not Started or Not Finished, and a permit year of 2021 or later. 29 rows in this radius carry no year at all — this layer has no issue date, only what can be read out of the permit number — and are neither listed nor counted above.

Roads

State road projects in Rutherford County. These are county-wide rather than filtered to your two miles, because the state does not publish project maps alongside them.

From the city

What I think it means

Belle Aire is not expanding. It is filling in.

Look at where the new houses are going: Hancock Street, Maney Avenue, Spring Street, Minor Street. Those are streets that have been here for decades. New construction arrives in twos and threes on lots that already existed, not in phases carved out of a field. The plats in front of the Planning Commission this quarter say the same thing — two lots here, three lots there, a thirteen-lot section from Habitat for Humanity.

Half of it is not detached houses

That is the part worth stopping on. Of the homes permitted here this year, roughly half are townhouses or duplexes rather than detached single-family. Across the rest of Murfreesboro that ratio is closer to eight in ten detached. Denser housing on established streets is what a built-out area does when demand is still there and land is not.

What it means if you own here

Your comparable sales are the older houses on your own street, not a builder's new phase a mile away. That cuts both ways. There is no model home down the road setting a price ceiling with fresh finishes and a warranty — but there is also no fifty-lot section about to compete with you the week you list.

The other thing shaping this area is not housing at all. Memorial Boulevard feeds into the North Thompson Lane widening, a state project taking that road to five lanes with sidewalks and a new bridge over the West Fork Stones River. Anyone who drives it daily already knows. It is worth knowing it is funded and scheduled rather than rumoured.

I am not going to tell you what any of this does to your value, because that depends on your house. But if you want the sales on your street rather than the citywide median, ask and I will pull them.

Where this came from

Compiled 2026-09-02, and these figures do not change after that date — a later reading is published as the next edition. Distances are measured from a point in Belle Aire to the nearest address on each street named.

Want the next one?

I write this once a quarter for a handful of Murfreesboro neighbourhoods. If you would like the Belle Aire edition when it is out, ask and I will send it. No charge, and nothing else comes with it.

Ask for the next report