The 2-Mile Report · Third quarter 2026

What changed within two miles of Riverview Park

Every figure below comes from a public record — the city's permit file, its planning and zoning boards, the county assessor's parcel roll and the state's road programme. Each one is checkable, and the sources are listed at the bottom.

Figures as of 2 September 2026, and fixed there. A later week is published as a new edition rather than by rewriting this one.

New homes going up

2026 so far
37
Peak, 2021
187
Since 2021
406
YearNew homes permitted
2021187
202254
202332
202443
202553
202637

These are permits for newly built homes only — not remodels, additions or commercial work — and the city's file runs about two months behind, so the current year is always incomplete.

Builders opening phases. Several lots permitted on one street on one day is a builder starting a section rather than neighbours coincidentally building. The most recent nearby: 3 lots on Winterfell Dr (2026-03-27); 3 lots on Winterfell Dr (2025-04-11); 5 lots on Winterfell Dr (2025-04-04).

What homes changed hands for

These are recorded transfer prices from the Rutherford County assessor's parcel roll — the amount written on the deed when a house changed owners. They are not MLS sold prices, and this is not a comparative market analysis. Nothing here is adjusted for condition, upgrades, seller concessions or how long anything sat.

Year Recorded sales countedMedian recorded price Median, resales only
2025268$535,000$516,000
2026 part year, 8 of 12 months218$519,995$510,000

Median price recorded on the Rutherford County assessor's parcel roll for parcels classed 'Single Family' within 2 miles of the centre, whose most recent recorded transfer fell in that year and was for $50,000 or more. Recorded transfer prices are not MLS sold prices, and this is not a comparative market analysis.

One of these years is still filling. A part year's count keeps climbing until December and cannot be set beside a finished year as though the two measured the same span, and even its median covers a different slice of the selling season. Read the medians beside one another rather than as a change: the year-on-year percentage this page could print would be smaller than its own margin of error, so it is not printed.

The most recent qualifying transfer on the roll inside two miles is dated 11 August 2026, about 22 days before this report was compiled. Deeds appear only once the assessor has processed them, so none of this is this week's market.

Why there is no five-year price line on this page

The county roll keeps one sale per parcel: the latest one, which overwrites the one before it. So a year older than the two above is not a record of what sold that year — it is only the homes that sold that year and have not sold since. The further back it goes, the more of the year has been overwritten, and the more the houses left in it are the ones that stayed put.

They are shown because leaving them out would look like a gap where there is an explanation. They are not a trend, they are not comparable with the figures above, and the two must never be drawn as one line.

Year Homes sold that year and still un-resold Median of those, and only those
2021375$429,000
2022306$495,000
2023222$498,175
2024204$520,000
  • 2021. Survivorship: 5 years of later resales have overwritten this year's parcels, so its count is a floor and its median describes the houses that stayed put.
  • 2022. Survivorship: 4 years of later resales have overwritten this year's parcels, so its count is a floor and its median describes the houses that stayed put.
  • 2023. Survivorship: 3 years of later resales have overwritten this year's parcels, so its count is a floor and its median describes the houses that stayed put.
  • 2024. Survivorship: 2 years of later resales have overwritten this year's parcels, so its count is a floor and its median describes the houses that stayed put.

The small print, in full

Every qualification the assessor's figures arrive with, unedited and in the words they were written in, including the ones that name the fields they came out of. Choosing which of these a reader sees is not this page's job.

In front of the boards

What has been asked for near you, and what the Planning Commission and Board of Zoning Appeals did about it. 18 items within two miles; 17 already decided.

Mandatory referral on North Thompson Lane

Mandatory referral — North Thompson Lane, 1.0 miles away

Public hearing scheduled Planning Commission, 19 August 2026

Special use permit on Ravenwood Drive

Special use permit — Ravenwood Drive, 0.7 miles away

Awaiting minutes Board of Zoning Appeals

Sanders Corner, Lots 1-3

Final plat · 3 lots or units · 4.61 acres — Sulphur Springs Road, 0.6 miles away

Approved Planning Commission, 19 August 2026 · P&H Joint Venture

Annexation on Old Lebanon Pike

Annexation — Old Lebanon Pike, 1.2 miles away

Approved Planning Commission, 5 August 2026 · LLC and the City of Murfreesboro

Rezoning on Old Lebanon Pike

Rezoning — Old Lebanon Pike, 1.2 miles away

Approved Planning Commission, 5 August 2026 · Hollingshead Land Development, LLC

Mandatory referral on Cherry Lane

Mandatory referral — Cherry Lane, 1.5 miles away

Approved Planning Commission, 5 August 2026 · Middle Tennessee Electric

Oak Stone Landing

Preliminary plat · 17 lots or units · 6.41 acres — Majesty Drive, 0.3 miles away

Approved Planning Commission, 15 July 2026 · Panola Saenphansiri

Cherry Blossom Downs, Resubdivision of Lot 10

Final plat · 2 lots or units · 0.38 acres — John Richards Drive, 1.1 miles away

Approved Planning Commission, 15 July 2026 · BNA Homes, LLC

Northfield-Smith LLC, Resubdivision of Lots 3 & 4

Final plat · 2 lots or units · 6.96 acres — North Tennessee Boulevard, 1.9 miles away

Approved Planning Commission, 15 July 2026 · Glen Hill Investments, LLC

Dollar General

Site plan · 1.49 acres — North Tennessee Boulevard, 1.9 miles away

Approved Planning Commission, 15 July 2026 · Jerrold Pedigo

Mandatory referral on Gene Dixon Drive

Mandatory referral — Gene Dixon Drive, 1.6 miles away

Decided Planning Commission, 1 July 2026 · Melissa Casserly and Ethan Arnaud

Special use permit on Memorial Boulevard

Special use permit — Memorial Boulevard, 0.4 miles away

Approved Board of Zoning Appeals, 24 June 2026

An item on an agenda has been applied for, not approved. Where a decision is shown it comes from the minutes of that meeting. Some of these matters the boards settle themselves and some they only recommend, with City Council deciding afterwards, and the minutes word both as a motion to approve — so an approval above may still have a Council stage to come, and this page does not tell you which.

Commercial and multi-family

Commercial and multi-family development, which the residential permit layer cannot see. Neither source classifies land use; project names are quoted as filed. The two stages below are kept apart on purpose: an application is not a building, and grading is not an opening.

Asked for — site plan applications

17 current within two miles: recently filed, and not cancelled — the eight most recently submitted are below. The layer holds 26 in this radius altogether, counting older applications and cancelled ones.

  • Stones River Manor Storage Building
    submitted 15 January 2026 · no status recorded yet · 1.0 miles away
  • 7 Brew Coffee Shop
    submitted 15 January 2026 · no status recorded yet · 1.3 miles away
  • Providence Christian Bleacher Shades
    submitted 15 January 2026 · no status recorded yet · 1.6 miles away
  • Providence Christian Academy
    submitted 15 January 2026 · no status recorded yet · 1.6 miles away
  • Murfreesboro Municipal Airport North Hanger
    submitted 17 December 2025 · Planning Phase · 1.5 miles away
  • United Communications
    submitted 19 November 2025 · Planning Phase · 1.6 miles away
  • Publix #1164 Generator Program Store
    submitted 11 September 2025 · Planning Phase · 0.9 miles away
  • PCA Athletic Field Phase 2
    submitted 11 September 2025 · Planning Phase · 1.6 miles away

An application, not an approval and not a building permit. Status is the city's own workflow wording, reproduced unchanged.

Started — land disturbance permits

1 open within two miles. Grading is the earliest physical signal the city publishes, months before anything is visible above ground — and it says only that earth may be moved. It is not a building, a tenant, or a date.

  • Redstone Federal Credit
    Active · 2.94 acres · 0.7 miles away

Grading is the earliest physical signal, and it is not an opening. The layer carries no issue date; the year shown is read from the permit number. Most rows have no address either, and are located by the mapped point alone. Counted as open on: status Active, In Process, Not Started or Not Finished, and a permit year of 2021 or later. 12 rows in this radius carry no year at all — this layer has no issue date, only what can be read out of the permit number — and are neither listed nor counted above.

Roads

State road projects in Rutherford County. These are county-wide rather than filtered to your two miles, because the state does not publish project maps alongside them.

From the city

What I think it means

Almost everything being built in Riverview Park is a detached house, and most of it is on one street.

Of the homes permitted here this year, all but a couple are detached single-family. That is worth noticing: closer in to town, around Belle Aire, more than half of this year's new homes are townhouses or duplexes. Riverview Park is still building the kind of house it already has.

One street is doing the work

Winterfell Drive has opened three separate groups of lots since early 2025, each a builder starting a section rather than neighbours coincidentally deciding to build. Add the seventeen-lot Oak Stone Landing plat the Planning Commission approved and a handful of two- and three-lot resubdivisions, and that is very nearly the whole picture.

So when someone says there is new construction in Riverview Park, it is worth asking where. A few streets are seeing a builder work through a section. The rest of the area is not seeing much of anything, which after the 2021 peak is the more accurate description of most of it.

What it means if you own here

Detached houses competing against detached houses is a simpler market to read than a mixed one. Your buyer is comparing your house to houses, not to a new townhouse with a warranty at a lower price per foot.

Two things sit on the edge of this. Memorial Boulevard and Thompson Lane both run into the North Thompson Lane widening, a five-lane state project with a new river bridge. And a grocery site has a traffic study on file at Memorial Boulevard — filed, not built, which is a distinction worth keeping.

If you want the sales from your specific street rather than the area, ask.

Where this came from

Compiled 2026-09-02, and these figures do not change after that date — a later reading is published as the next edition. Distances are measured from a point in Riverview Park to the nearest address on each street named.